Wind access research and the mill biotope

A mill needs free wind to turn. Anyone who wants to build or plant nearby needs to know what that does to the mill's wind access. EAGM assesses this independently, from the first exploration for a spatial vision to the testing of a specific building plan.

Drainage mill in the open polder landscape

Two methods

The question determines the method

GIS analysis: where is it possible?

For municipalities preparing a spatial vision or zoning plan. Using public elevation data and wind statistics, we map the surroundings of one or more mills: where do buildings and trees already slow the wind, from which directions does the wind blow most often, and where would new development affect the mill most? The result is a map that shows in advance where there is room.

Example project: mill biotope and housing

CFD: what does this plan do?

For a specific building plan close to a mill. A flow calculation (CFD) computes the wind through the whole situation, including the interaction between the new building, existing buildings and trees. This shows whether a building falls in the shelter of existing obstacles, or whether the wind access does get worse.

We assess the effect over the whole area swept by the sails, not just at one point, and translate it into the hours per year that the mill can turn and grind.

Approach

Calculating where it matters

We start with GIS and wind statistics to determine which wind directions matter for the question. Only those directions are calculated with CFD. That keeps the study limited to what is needed.

The mill biotope formula of De Hollandsche Molen (the Dutch mill society) assesses obstacles one by one. That is useful as a first check, but says little about how buildings and trees act together. If the municipality or province tests against the formula, we set our results alongside it.

The mill biotope is not only about wind. Sight lines to the mill and the openness around it also determine how a mill sits in its surroundings. We include these in our advice.

Independent

EAGM does not work towards a desired outcome. Whether an effect is acceptable remains a judgement for the competent authority. That is precisely what gives the research its weight, for developers and for government.

For mill owners, mill foundations and mill organisations, for municipalities, provinces and water boards, and for developers and architects.

See also: spatial development around monuments.

Contact

A building plan near a mill?

Call or email us. We first discuss what is going on and what you need, before we make a proposal.

Phone
+31 348 473 751
Email
info@eagm.nl