The iron drawbridge in a historic harbour could no longer open and was only accessible to cyclists and pedestrians. EAGM inspected the bridge, wrote the specification and supervised the restoration.

The task
The drawbridge, a national monument, was in poor condition. The steelwork showed extensive corrosion and the bridge could no longer open. Other tasks were in play around the harbour at the same time: the banks, a quay wall and a connection for cyclists and pedestrians.
Our role
In 2023 we recorded the condition of the bridge. On that basis EAGM prepared the specification, handled the permit application and supervised the tender in 2024. During the restoration in 2025 and 2026 we followed the work, including in the workshop where the moving machinery was repaired.
For the new quay wall and footbridge in the same harbour, EAGM also wrote the specification, including the pre-application consultation on the permit.
The result
In April 2026 the bridge was completed. At the opening, the leaf went up again.













More about this service: Bridges, sluices and waterworks
Contact
A question about your monument?
Call or email us. We first discuss what is going on and what you need, before we make a proposal.
- Phone
- +31 348 473 751
- info@eagm.nl